Description
CONFERMA MICRO 120 PR
PLANT “MICRO 120”-PR FOR THE PRETREATMENT AND PAINTING OF THE ALUMINIUM SHEETS AND PROFILES
CONSTRUCTION:
The entire line is modular and main components are clamped onto hollow stuctural steel tubing. It was packed in 21 Containers. A giant Lego set. Total weight ±60 tons. All attaching points for assembly are bolted together, with draw rod type clamping.
OPERATION:
Parts are attached to removable bars that clip into the orange conveyor segments on each side (red in photos)
The continuous conveyor carries parts into the full length cleaning / pre-treatment tanks. Various nozzles spray in pre-determined pattern for 100% coverage. Parts are rinsed and dried then go to the two cross-travelling stations of electrostatic coating.
The powder dispensing units and spray nozzles are on two separate carriages rolling cross-wise to the line moving at the required speed and spray volume, to achieve full coverage. There are parking areas in the line for parts to gather to allow for variations in the time of completion of each batch or part type, thus buffering the system to optimize throughput.
The coated parts move up and over the opening sill, into the baking oven. Then on completion of the baking time the parts are lowered from the output sill to the unloading area.
There is variable speed horizontal conveyor in the unloading zone to gather parts as may be necessary for additional cooling, handling, packaging etc. as may be necessary.
Personnel employed as this line was recently operating: 2 workers loading parts, 1 monitoring the overall process, and 2 workers unloading and packaging finished product .
For many smaller parts, the plant suggests that 2 additional workers might be needed loading and unloading parts.
DIMENSIONS. Overall system (To verify)
- 130 ft. Long x 40′ Wide x 25′ High
Other exterior supports extend for ductwork control panels, conduit, etc. - About 200 ft. Long x 40 ft. wide. 30 ft. High.
Auxiliary equipment is attached along one side. - Mezzanine platforms, Ventilation duct work plumbing, pipes, catwalks and grill work, conduits, control cabinets etc. are all included. THIS IS A TOP QUALITY COMPLETE WORKING SYSTEM.
- THE PRODUCT QUALITY IS DESCRIBED AS “SECOND TO NONE”
- Please CALL Immediately if you are interested in acquiring this system.
Toll-free: 888-459-4024
Cell: Dan at (514) 992-9353 / John at (514) 867-3131 / Robin at 514-952-3132 - We might consider a deferred payment agreement.
- This system need to be removed from the building SOON!. Time is fleeting.
- We have available some equipment to aid in your removal. (Forklifts, Skyjack, Boomlift, rigging equipment, AND a rigger or two. etc.)
- Your own staff can have full 24 hour access on site and we will facilitate your removal in every way possible.
“Current estimated replacement cost – $6.5 million CAD”
Sacrifice… 1/4 Price…or less.
Call NOW. Buy NOW. Pay Later!
PHOTO GALLERY
(USER ARROWS ON LEFT AND RIGHT OF IMAGE TO NAVIGATE)